Before Starting any work, generally, the process of cleaning
occupies, the priority. Similarly, before starting construction, the
construction site should be thoroughly cleaned and prepared for construction.
This is called purging of the site from evil effects.
This process requires a well experienced mason, who is as
important as engineer. An inexperienced mason with his inefficiency may mar the
fortunes of the residents of the proposed house. Many masons have correct
understanding of Vaastu, brought by generations. The masons should possess
accurate tools to mark the directions and to measure the site. Their important
tools, setsquare to fix, correct corners, intermediate directions, and plumb
line to ensure perpendicular accuracy of the walls, should be used with diligence.
The same tools should be used until the construction is completed, otherwise,
there may be differences in areas of the rooms and place in between parallel
walls.
First the mason should identify all the eight directions
correctly, which is followed by cleaning, and preparation of plot. The
directions, south, west, and southwest must be elevated than east, north, and
northeast. Any pits, shallow places, wells in weak or unfavourable positions
should be filled up. The surface of the site should be levelled with raise in
the directions of south, west and southwest. Avoid sites with anthills.
Levelling and reforming, raising in the site must be done
before starting construction, but not after, to avoid evil effects of Vaastu. A
well or bore well must be sunk in north east, east or north after the
foundation is laid and only its water must be used for construction. At least,
a sump must be laid in any of these directions. Do not store, the construction
materials like bricks, tiles, wood, steel, stones, lime in north, east or
northeast use south, west or southwest for storing them.
Starting of work:
Work should ensure that the excavation starts from northeast and proceeds
towards north west. Repeat the same process from northeast to southeast and
from northwest to southwest. This process should end by excavating the southern
side from southeast to southwest. The work of foundation must start from
southwest to southeast, southwest to northwest; southeast to northeast and end
from northwest to northeast. Similar process is required for wall
constructions. Importantly, at the end of any day, the walls at southern and
western sides should be higher than the walls at north and eastern sides. The
temperature in the locality determines the height of walls; prefer high ceiling
if the temperature is high and low ceiling if temperature is low.
Pillars: Pillars
should square or cylindrical in shape but pillars at southeast must be
invariably square in shape. Main entrance should not face the edge of any wall,
pillar, or compound wall. Likewise there should not be any tree, well, sump,
pit in front of the main door. The northeast corner of the outer walls,
compound wall should never be rounded off, where as it is permitted in other
comers. Do not have arches of semicircular shape on gates located on eastern
and northern sides, but such semicircular arches are permitted on gates located
in south and west.
Flooring: The
flooring of the house should laid so as to facilitate the flow of water from
southwest to northeast. The level of doors should gradually go on reducing from
south to north and west to east. The floor level of the rooms in southwest
should always be higher when compared to other rooms in the house and it should
be lowest at northeast. The flooring should be strong and firm avoiding any
shallow sound. If you are demolishing any old house, start it from northeast
and store reusable items in southern or western parts of the site, since the
work if starting from south or West brings ill health to senior male and female
member of the house. An experienced mason knows most of these basic principles
who plays an important role.